PROMISED MITIGATION FOR EL SERENO (City of Los Angeles)

  • Planting in the freeway corridor (in the Valley Boulevard area) which provides a rich landscaped environment and discourages vandalism and graffiti, with recommendations that shrubs and clinging vines be planted on both sides of the soundwalls.

  • Institute streetscape design elements on Commonwealth Avenue, for one block east and west of the 710 corridor, including landscaping, ornamental street lighting, paving, benches, tree grates, trash receptacles, signing, and other design features.

  • Special architectural treatment for Valley Boulevard and Huntington Drive bridges.

  • Institute streetscape design elements on Huntington Drive, for one block east and west of the 710 corridor, including landscaping, ornamental street lighting, paving, benches, tree grates, trash receptacles, signing, and other design features.

  • Three proposed alternatives to the Templeton Area near the cut-and-cover tunnel, which include: (1) additional residences to visually match the existing community, (2) a new visually aesthetic 9-acre park for the community (much needed since the area only has one other park), or (3) a mix of the visually attractive park and community-matching residential structures.

  • Landscape improvements in the Templeton Street area consisting of street trees and park landscaping.

  • Ensuring that the Huntington Drive Bridge (near Sierra Vista School), be constructed so that it exhibits architectural treatment similar to other bridges in the local community.

  • Institute streetscape design elements on Alhambra Road, for one block east and west of the 710 corridor, including landscaping, ornamental street lighting, paving, benches, tree grates, trash receptacles, signing, and other design features

  • Planting of street trees in the median of Huntington Drive to replace those lost during freeway construction. Trees should be replaced to match existing trees.

  • Potential development of a beautiful 5-acre park adjacent to Maycrest Road.